Clacton East - Highways Schemes - Update

 

Frinton Road Puffin Crossing

Designs being completed.  Implementation anticipated by end 2016

Vista Road/Skelmersdale Road new yellow backed Give Way signage

Design completed in March 2016.  Implementation anticipated by end 2016

Holland Road/Valley Road roundabout

Scheme will not be feasible – Feasibility report completed - In summary the introduction of a mini roundabout is physically possible, however as the traffic survey from the traffic survey suggests a substantially lower flow of vehicles entering from Arm C. No cost has been prepared as this scheme will not be feasible

Frinton Road installation of verge bollards

Feasibility Study commissioned – Options will now need to be discussed for implementation

Valley Road (Range junction)

Feasibility Study commissioned - Options will now need to be discussed for implementation

Footpath 46, near Nansen Road

To create a surfaced path 1.5m wide – Natural surface path which becomes very overgrown. The footpath is situated within an urban area and in its current condition is not considered fit for purpose.  Creation of a black topped, surface path measuring 1.5m wide with wooden edging.

Valley Road

Two new bus stops – The money has been commissioned for two new stops, unfortunately as ECC is currently retendering routes around the district the exact location of the new stops is not known.  I will keep you posted.

Marine Parade East pedestrian crossing

 

Monies have been commissioned for the detailed design of a zebra crossing at the location below.  This will be a design for 16/17 only with look to implement in the 17/18 financial year.  

 

 

.